姜森电动二通调节阀厂(上海)有限公司

当前位置:姜森电动二通调节阀厂(上海)有限公司>>电动阀门>>电动二通阀>> VPF江森动态平衡电动二通阀/动态平衡电动两通阀

江森动态平衡电动二通阀/动态平衡电动两通阀

参  考  价:面议
具体成交价以合同协议为准

产品型号VPF

品牌

厂商性质生产商

所在地上海市

更新时间:2015-03-28 09:43:27浏览次数:830次

联系我时,请告知来自 环保在线
江森动态平衡电动二通阀/动态平衡电动两通阀,电动调节阀安装前请仔细阅读产品说明书,核对产品型号。
. 水流方向必须按照阀体上指示得方向相同。3. 在用于风盘或空气处理机组管路时,阀体须位于接水盘上方,以保证出现滴水时落 入接水盘中。


动态平衡电动二通阀安装说明

. 安装前请仔细阅读产品说明书,核对产品型号。

. 水流方向必须按照阀体上指示得方向相同。

3. 在用于风盘或空气处理机组管路时,阀体须位于接水盘上方,以保证出现滴水时落 入接水盘中。

4. 阀体及执行器安装于垂直方向±60范围内,其上方应至少有30mm空间用于拆装。 与周围管道、设备、建筑物必须保持足够的维修操作空间,必须安装在维修人员通 过检修孔能触及到的地方。

5. 阀体安装完毕并与管路通过试压后才可安装执行器。阀前需装过滤器。

6. 所有接线需遵守国家和地方电气规范,执行器须避免受潮。

Instructions

. Read the instructions carefully, check the product model before installation.

. Flow direction must be identical with the direction on the valve body.

3. When used on a pipeline of fan coil or air handling units, valves shall be located above the water tray to ensure the possible drop fall into the tray.

4. The valve and actuator are recommended to be mounted within ±60 degrees of

the upright position. Above it there should be at least 30mm space for assembly and disassembly. The valve and actuator must be installed with suf?cient operating space around pipelines, equipment and buildings, and where maintenance worker can touch through the access hole.

5. The actuator can only be installed after the valve installed and pressure tested. Strainer is required before the valve.

6. All wiring must comply with local, regional, and national electrical code requirements. The actuator housing must be protected from moisture.

安装方向/Installation direction

Instructions

. Read the instructions carefully, check the product model

before installation.

. Flow direction must be identical with the direction on the valve body.

3. When used on a pipeline of fan coil or air handling units, valves shall be located above the water tray to ensure the possible drop fall into the tray.

4. The valve and actuator are recommended to be mounted within ±60 degrees of

the upright position. Above it there should be at least 30mm space for assembly and disassembly. The valve and actuator must be installed with suf?cient operating space around pipelines, equipment and buildings, and where maintenance worker can touch through the access hole.

5. The actuator can only be installed after the valve installed and pressure tested. Strainer is required before the valve.

6. All wiring must comply with local, regional, and national electrical code requirements. The actuator housing must be protected from moisture.


法兰电动二通调节阀北京供应

法兰电动二通调节阀供应供应配以电子驱动控制装置后,

法兰电动二通调节阀厂家供应

法兰电动二通调节阀厂家供应配以电子驱动控制装置后,

上海供应法兰电动二通调节阀

上海供应法兰电动二通调节阀配以电子驱动控制装置后,

会员登录

×

请输入账号

请输入密码

=

请输验证码

收藏该商铺

X
该信息已收藏!
标签:
保存成功

(空格分隔,最多3个,单个标签最多10个字符)

常用:

提示

X
您的留言已提交成功!我们将在第一时间回复您~

以上信息由企业自行提供,信息内容的真实性、准确性和合法性由相关企业负责,环保在线对此不承担任何保证责任。

温馨提示:为规避购买风险,建议您在购买产品前务必确认供应商资质及产品质量。

在线留言